
2. Align the top edge of a temporary 1-by-3 support rail with the line for the bottom edge of the cabinets and drive three or four 2-inch screws through it into the wall studs.
3. Drill pilot holes through the sturdy part of the cabinet back or its support rail into wall studs. Screw the cabinet to the wall using two screws that are long enough to penetrate the studs by at least 1 1/2 inches.
No comments:
Post a Comment